Arizona Magma Flood Control District

Partial logo with large 'G' and 'CONTROL' text below.

BOARD MEMBER ELECTIONS on October 7th, 2009

We encourage all members of the District to learn about the issues facing the District...
Minimalistic gray letter M on a white background.

PUBLIC OPEN HOUSE

In cooperation with the NRCS, the District has initiated planning for the Dam Rehabilitation Project....
A large gray letter 'M' on a white background.

Status Update–mailed to all District Property Owners

On 9/21/09 the attached letter was mailed to all District property owners.safetynoticelettertodistrict9-21-09final.pdf
Silhouette of a man wearing a hat.

ADWR improves the Dam’s safety status classification

Arizona Department of Water Resources recently removed the "elevated risk" designation on the Magma Flood...
A large gray letter 'M' on a white background.

August 5, 2009 MFCD Board Mtg

See mtg. minutes attached: MFCDMINUTESAUGUST52009.doc
Blue water control structure near riverbank.

Latest Dam Repair Cost Estimates

The attached document outlines the latest cost estimates to repair the Dam.MFCDDamRepairCostEstimate6-11-09.pdf
Water canal under a clear blue sky.

latest ADWR safety letter to MFCD

See letter attached.ADWRsafetylettertoMFCD7-16-09.pdf
Detailed chart showing reservoir data, pool stages, and current conditions in feet.

June 25, 2009 MFCD Board Mtg

See mtg. minutes attached: JUNE252009MINUTES.doc
Businessman and construction worker standing together.

June 9, 2009 MFCD Board Mtg

See mtg. minutes attached. MFCDMINUTESJUNE92009.doc
A large, shallow water body under a cloudy sky with surrounding dry land.

March 11, 2009 MFCD Board Mtg.

See mtg. minutes attached: MFCDMINUTES3-11-09.doc